What is the second step in the sequence of actions to temporarily remove lockout tag?

Study for the 360 Training OSHA 30hr Test. Utilize flashcards and multiple choice questions; each question comes with hints and explanations. Prepare efficiently for your exam!

Multiple Choice

What is the second step in the sequence of actions to temporarily remove lockout tag?

Explanation:
In lockout/tagout, safety hinges on controlling energy and ensuring no one is exposed to startup or energy releases as devices are removed. The second step is to clear the machine area of all personnel. This protects workers from unexpected energization or stored energy that could injure someone when the lockout devices are removed and the equipment is re-energized for testing or repositioning. After the area is clear, the authorized employee can proceed with removing the lockout devices and then reenergizing to perform the necessary checks. Other actions, like energizing the machine for testing or removing tags before ensuring the area is safe, would introduce unnecessary risk and occur later in the sequence.

In lockout/tagout, safety hinges on controlling energy and ensuring no one is exposed to startup or energy releases as devices are removed. The second step is to clear the machine area of all personnel. This protects workers from unexpected energization or stored energy that could injure someone when the lockout devices are removed and the equipment is re-energized for testing or repositioning. After the area is clear, the authorized employee can proceed with removing the lockout devices and then reenergizing to perform the necessary checks. Other actions, like energizing the machine for testing or removing tags before ensuring the area is safe, would introduce unnecessary risk and occur later in the sequence.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy